Chemical Lab Hood Exhaust System
When a chemical research facility recently upgraded their lab hood exhaust system by removing over 150 individual exhaust fans and installing a common exhaust system for the lab hoods, they contracted SMCA of Philadelphia and Vicinity member contractor Ernest D. Menold, Inc.

The scope of work included:
- Measuring and sketching ductwork on the roof and in the laboratories.
- Fabrication of ductwork, including stainless steel exhaust duct.
- Installation of ductwork on a phased basis to reduce downtime for researchers.
- Installation of hi-efficiency exhaust fans.
- Leak testing of the system.
- Air balancing the new system.
The new system uses less energy (150 fan motors replaced by two fan motors), and is much more efficient.
Senator Robert Casey’s visit to the Local 19 Training Center on September 10, 2010. 