Chemical Lab Hood Exhaust System

When a chemical research facility recently upgraded their lab hood exhaust system by removing over 150 individual exhaust fans and installing a common exhaust system for the lab hoods, they contracted SMCA of Philadelphia and Vicinity member contractor Ernest D. Menold, Inc.

The scope of work included:

  • Measuring and sketching ductwork on the roof and in the laboratories.
  • Fabrication of ductwork, including stainless steel exhaust duct.
  • Installation of ductwork on a phased basis to reduce downtime for researchers.
  • Installation of hi-efficiency exhaust fans.
  • Leak testing of the system.
  • Air balancing the new system.

The new system uses less energy (150 fan motors replaced by two fan motors), and is much more efficient.

Find a contractor

Senator Casey Tours Local 19 Training Center

Senator Robert Casey’s visit to the Local 19 Training Center on September 10, 2010.

Watch it now

Check out our photo archive

  • SMCA Past President Ernest Menolds with Steve DiValerio from Villanova University following the presentation
  • Guest speaker Chip Carson of Carson and Associates
  • Ernest Menold with winner of the iPod Touch, Timothy Rose

View our Flickr Photostream

Our Industry Partners

  • smwia

  • smacna

  • nemi

  • ashrae

  • hvac-expertise

  • iti

  • tabb

  • aws

  • smohit

  • ICB

Created by Matrix Group International, Inc ®